Our Work
Current Projects
Current Projects
Camp Lejeune Military HousingCamp Lejeune project control boards: These control boards are built at the FLS Energy warehouse and shipped to Camp Lejeune. In the end, we will create 900 control boards in house for the solar hot water systems installed at the Camp Lejeune base housing. |
Armed Forces Reserve Center
Mt. Carmel, TN |
Glen Rock Depot, River Arts District
Asheville, NC FLS Energy is installing 60 solar thermal panels for the 60 affordable housing units in the new development. CLICK HERE FOR MORE INFORMATION |
Biltmore Farms
|
Kimberly ClarkFLS Energy and Duke Energy are working together to bring solar power to the Kimberly Clark facility in Hendersonville, NC. |
Asheville-Buncombe Technical CollegeFLS Energy is installing solar energy systems on three buildings at two different AB Tech campuses, including the Blue Ridge Food Ventures building at the Enka Campus. |
SAS InstituteFLS Energy and groSolar have teamed up to bring 1.2 MW of solar power to SAS Institute's headquarter campus in Cary, NC. |
RECENT NEWS
FLS Energy Tweets
An error occurred
Oops, an error seems to have occurred. We're sorry for any inconvenience this might have caused. If the error persists, feel free to tell us about it.
